Professional Waterproof Coatings for Pool Polyurea Coating for Durable Water Protection
Professional Waterproof Coatings for Pool Polyurea Coating for Durable Water Protection

Professional Waterproof Coatings for Pool Polyurea Coating for Durable Water Protection

This product is a water-based environmentally friendly waterproofing material formulated from high molecular weight polymer emulsion, exhibiting flexibility, sealing properties, and penetration characteristics
Send Inquiry

Products Description
Product name
Water Pool Waterproof Coating
Color
Red, blue, gray
Attribute
Waterproof Coating
Scope ofapplication
pool, Swimming Pool, waterscape
Certification
FranchA+,CELP,CCC
Specification
20KG/Bucke
Coverage Rate
1m²/kg
Method
roller coating
Shelf Life
12 Months
DryingTime
Tsurface Dry 4 hours  Totally Dry 24 hours
Origin
China
Trademark
Cafonci
Roofing Waterproof Coating
This product is a water-based environmentally friendly waterproofing material formulated from high molecular weight polymer emulsion, exhibiting flexibility, sealing properties, and penetration characteristics.
The emulsion forms a rubber-like elastic membrane upon curing, delivering superior weather resistance, abrasion resistance, and waterproof impermeability performance.
 √  High/low temperature resistance
 √ Stable film formation
 √ Rapid efficiency
 √ Traffic and abrasion resistant
 √ High elongation rate
 √ Strong adhesion strength
 √ Exceptional  Flexibility
 √ Eco-Safe&Health-Conscious
 √ Extended Service Life
 √ Easy Application
Application Range
Cafonci Rooftop Waterproof Coating offers extensive application versatility, covering building construction, infrastructure, and interior waterproofing sectors.

2.jpg

3.jpg

Construction Methods
steps1.
 Clean substrate surface, apply primer coat first, thenapply this product; ready-to-use formulation suitable forroller application, brush application, or spray application,with coverage approximately 1m2/kg.
steps2.
During construction, treat corners, edges, and pipepenetration areas first,then proceed with large surface areaapplication; segmented construction may utilizeinterior/exterior wall corners as boundary demarcationlines.
steps3.
Theoretical drying interval time: minimum 4-hour dryingperiod required after application before applying secondcoat by spray, roller, or brush methods. Recommend 24-hour interval between first and second coat applications,following thin multi-coat application principle.Clean substrate surface; after applying primer or K11 basecoat, apply two coats ofthis product.
Precautions
1. Maintain substrate cleanliness, ensuring dry conditions free from moisture, dust, and loose structural elements.
2. Minimum two-coat application recommended with 90-degree cross-directional application pattern between coats. Pipe penetrations, floor drains, inside/outside corners, and expansion joints require reinforced treatment.
3. Traffic and water exposure prohibited until coating is completely dry. Coating must be protected from sharp objects and deliberate damage. Bathrooms, water tanks, and similar areas require complete curing before conducting flood testing procedures.


Leave Your Message


Leave a message